DrillTape
Corrections and updates
When we get something wrong, we correct it visibly and record it here.
Accuracy is the whole of DrillTape's claim on readers' trust, so errors are corrected, not hidden. A correction to a published article is made in the article itself, marked as a correction with the date, and listed on this page.
How to report an error
If you spot an error in a DrillTape article, please tell us. Use the form on our contact page and choose the corrections purpose. Include the article, the passage you believe is wrong, the correct information and the source for it. A source we can check makes a correction much faster.
How corrections are investigated
Every report is checked against the primary source: the ASX announcement, company release, exchange data or official report behind the passage. We do not correct on the strength of a second publication alone, and we do not correct on the strength of an assertion without evidence. If the primary source confirms our version, we reply to say so and explain why. If it does not, we correct.
How corrections are disclosed
A material correction is disclosed on the article itself with a dated correction note stating what was wrong and what it now says, and it is listed on this page. The original error is not erased from the record: the note describes it plainly. We never silently rewrite a published article to remove an error.
Minor and material changes
A material change is one that affects the facts a reader would rely on: a figure, a grade, a date, a name, a quote, a comparison or the meaning of a passage. Material changes are corrections and are disclosed as described above.
A minor change is one that does not affect the facts: a spelling or punctuation fix, a broken link repaired, a caption tidied, an image replaced with a more suitable photograph of the same subject. Minor changes are made without a correction note, unless the image change affects what the photograph shows, in which case it is disclosed in the correction note like any other material change.
Timestamps
Every article shows its publication date. An article that has been corrected carries a dated correction note, so a reader can see when the correction was made and what changed. An article that has been updated with new information carries a dated update note.
Corrections record
One correction has been issued to date:
- 25 November 2026.West Cobar hits 8m at 352ppm scandium oxide in first Salazar assays. An earlier version compared Salazar's scandium oxide grade with NiCo Young's elemental scandium grade, stating Salazar's grade was almost five times NiCo Young's and comparing 2,300 tonnes of scandium oxide with 6,400 tonnes of elemental scandium. The two figures are on different measurement bases and cannot be compared directly. Converted to a common elemental basis, Salazar's 153 parts per million scandium oxide is equivalent to about 99.8 parts per million elemental scandium, roughly 3.1 times NiCo Young's 31.9 parts per million, and Salazar's 2,300 tonnes of scandium oxide is about 1,500 tonnes of elemental scandium, against NiCo Young's 6,400 tonnes. The comparison paragraph was corrected. The featured image was also replaced: the original photograph showed reverse circulation drilling in the Pilbara, not the aircore program at Salazar. The new image is a file photograph of exploration drilling, not the Salazar program.
Last updated: 25 November 2026.