Every ASX mining announcement speaks a private language. A company reports 23 million tonnes at 1.3 grams per tonne, calls part of it Indicated and part of it Inferred, then announces a Probable reserve smaller than the resource. The words are categories defined by the JORC Code, and each one carries a different level of confidence. This guide explains what each category means, how a resource becomes a reserve, and how to read the numbers.

What the JORC Code is

The JORC Code, the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, sets the minimum standards for public reporting of exploration and mining results by ASX-listed companies. It was prepared by the Joint Ore Reserves Committee of AusIMM, the AIG and the Minerals Council of Australia. The 2012 edition is in force, mandatory from 1 December 2013. The Code binds AusIMM and AIG members and is written into the ASX and New Zealand Stock Exchange listing rules. Its principles are Transparency, Materiality and Competence. It governs how results are reported, not how the geology is estimated.

The ladder, from first drill hole to a mine

Reporting moves up a ladder of confidence. At the bottom are Exploration Results: drill intercepts and sample grades. Above them sits the Mineral Resource, an estimate of tonnage and grade in three categories: Inferred, Indicated and Measured. At the top is the Ore Reserve, the part of the resource a study shows can be mined economically, in two categories: Probable and Proved. A drill hit is not a resource, and a resource is not a reserve.

What a Mineral Resource is

A Mineral Resource is a concentration of solid material of economic interest with reasonable prospects, meaning more likely than not, for eventual economic extraction. The Competent Person must disclose the basis for that judgement, including the cut-off grade, the minimum grade counted in the estimate. The time frame can exceed 50 years for bulk minerals, and is usually 10 to 15 years for smaller deposits. A resource is always an estimate, never a calculation, and figures are rounded to reflect their uncertainty.

Inferred

An Inferred resource rests on limited geological evidence and sampling. The evidence is enough to imply geological and grade continuity, but not to verify it. It is the lowest-confidence category, and it must not be converted to an Ore Reserve. Most could be upgraded with more drilling, but upgrading should not be assumed.

Indicated

An Indicated resource rests on adequately detailed and reliable exploration, sampling and testing. The data are close enough to assume continuity between points of observation, with enough confidence to apply the Modifying Factors for mine planning. An Indicated resource may only be converted to a Probable Ore Reserve.

Measured

A Measured resource rests on detailed and reliable evidence, spaced closely enough to confirm continuity rather than assume it. It is the highest-confidence resource category. It may be converted to a Proved Ore Reserve, or to a Probable Ore Reserve where the Modifying Factors carry more uncertainty.

What turns a resource into a reserve

The Modifying Factors are applied: mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors. Only a Pre-Feasibility Study or a Feasibility Study can support a reserve. A Pre-Feasibility Study establishes a preferred mining method, pit configuration, processing method and financial analysis. A Feasibility Study adds the detail for a final investment decision. A Scoping Study is an order-of-magnitude test of whether a project could work, and it cannot support a reserve. A reserve includes diluting material and mining losses, so its grade is usually lower than the resource it came from. The Code forbids deriving a reserve by factoring a resource without a mine design or mine plan. Viridis Mining and Minerals showed the discipline in practice: its maiden Ore Reserve for the Colossus rare earths project in Brazil, announced 20 August 2025, was 200.6 million tonnes at 2,640 parts per million total rare earth oxides, entirely Probable and derived only from Measured and Indicated resources, with Inferred material excluded as waste.

Probable and Proved

A Probable Ore Reserve is the economically mineable part of an Indicated resource, or in some circumstances a Measured resource. Confidence in the Modifying Factors is lower than for a Proved reserve, but sufficient to base a development decision on. A Proved Ore Reserve is the economically mineable part of a Measured resource, with high confidence in the Modifying Factors. The rule that catches readers out is the one-way street between the two ladders. An Indicated resource can never be converted directly to a Proved reserve, however confident the study is. Confidence in the study cannot override the confidence in the geology.

Exploration Targets: the category that is not a resource

An Exploration Target is a statement of exploration potential, quoted as a range of tonnes and grade, where there has been insufficient exploration to estimate a Mineral Resource. It is not a resource, and the words resource and reserve must not be used for it. Every public statement must explain the basis, describe the exploration completed, and carry a clarification in the same paragraph: the potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource, and it is uncertain whether further exploration will result in one. A target must not be a headline statement, and the proposed work to test it, with a timeframe, must be specified.

How to read a resource announcement

Take a hypothetical gold deposit: 10 million tonnes at 1.2 grams per tonne Inferred, 8 million tonnes at 1.4 grams per tonne Indicated, and 5 million tonnes at 1.5 grams per tonne Measured. Contained gold is tonnage times grade: about 386,000 ounces Inferred, 360,000 Indicated and 241,000 Measured, using 31.1035 grams to the troy ounce. The total is 23 million tonnes holding about 987,000 ounces. The breakdown is the story: only 13 million tonnes sit in categories that can ever become a reserve, and 10 million tonnes are Inferred, which cannot. Four rules cover most of what can go wrong. Categories must not be combined into one figure unless the individual figures are also given. Contained metal must not be reported without the tonnages and grades behind it. Resources and reserves must never be added together. When both are reported, the company must state whether the resources are inclusive of, or additional to, the reserves. Before taking any resource number at face value, check the cut-off grade, the estimate date, the Competent Person, the supporting study, and whether Inferred material is in the mine plan.

Who signs it: the Competent Person

Every resource and reserve figure is signed by a Competent Person: a Member or Fellow of the AusIMM, the AIG or a Recognised Professional Organisation, with a minimum of five years of relevant experience. The Competent Person is named in the public report, and the company, through its board, owns what is published.

Sources